logo
logo
Sign in

Precautions during the Use of LSAW Steel pipe

avatar
Permanent Steel Manufacturing Co.,Ltd
Precautions during the Use of LSAW Steel pipe

1. Construction preparation before use of LSAW steel pipe

Pipe trenches must be dug, pipe wells must be built, all kinds of straight seam steel pipes must be in place, and all kinds of tools needed, including welding machines, cutting machines, electric hammers, polishing machines, etc., must be fully prepared . Only after doing a series of preparations can the installation begin.


2. Installation of LSAW steel pipe

According to the design of the drawing, the pipe support is prefabricated according to the site conditions, and then the material is cut according to the design and site, and then the groove is polished with a polishing machine, and then welded.


3. Use quality requirements

1. The deviation of the vertical installation standpipe should be less than 3 mm per meter, and the deviation of the horizontal installation should be less than 1 mm.
2. The branch pipe shall not be welded at the welding seam, and there shall be no welding seam at the bend. .
3. The welding must be straight, full of welds, and no burn through or cracks on the weld surface.

collect
0
avatar
Permanent Steel Manufacturing Co.,Ltd
guide
Zupyak is the world’s largest content marketing community, with over 400 000 members and 3 million articles. Explore and get your content discovered.
Read more