When it comes to dealing with the crane industry different products and services come into action, each one having to play their own role in specified areas. And there is no denying the fact that the interest and importance of any part cannot be neglected. Any ignorance in the essence of overhead crane training can have repercussions. Prioritizing any particular sector is a common happening, but it’s time now to have a comprehensive look and a holistic approach when it comes to crane load testing.


Crane load testing is considered to be a little more important than the final stage of new crane installation because of many known reasons. Here we offer a holistic approach and better understanding of crane load testing.

Complete Knowledge is a must

It has been commonly observed that lifting technologies of various types and capacities are put to work without complete knowledge and understanding of the conditions of the crane.

What is load testing?

In simple terms, load testing is not limited to verifying the amount of load and the capacity of carne that can be carefully lifted. This is actually about fetching important information of multiple aspects that will eventually lead to better-informed owners, manufacturers, dealers and all the other included in the hierarchy.

That is why it is said, that knowledge is not merely power, and it is life.

Earlier, the crane load testing was carried out with the solid weights for monitoring the safe working for overhead crane load test to know all about its advantages. This was primarily meant for North Sea oil and gas installations. Later in order to limit and control the astronomical cost linked with the task, water weight crane load testing was introduced.

As it was easier to efficiently transport empty water bags for testing, the use of water weights came as an advantage. Some concerns about moving the filled water bags onto the location were expressed, which were later resolved. The team now did not have to fill the water bags for crane load testing until the bags were safely tied beneath the hook.

When is load testing required?

Most commonly, load testing is practised as per the guidelines issue by OSHA. It says that the crane load needs to be tested in case of new installation and/ or the replacement of the important load bearing part of the crane. However, states like California have their own set of rules in the same regards.

The standards set in the regulation shall be considered as the starting point and the minimum requirement. Also, without the complete knowledge, crane load testing is simply noting and verifying the load that a crane can lift at any point in time. However, it will not be held responsible for the abuses that the lifting equipment might encounter at any time during its operation.

Failing of Load Test

It is to note that not all the crane load testing is the same and the companies and users have to carefully choose a partner in order to get the best possible results with testing. Also, one must look for mobile testing companies that can actually visit the respective sites with solid wastes to conduct crane load testing companies.

Another important thing to consider before conducting the test is that the load testing should be conducted in a safe environment. As in case the crane fails, any serious hazard can be avoided.