logo
logo
Sign in

How to get rid of a swimming pool

avatar
Demolition Melbourne
How to get rid of a swimming pool

People often decide to remove a pool if they are not satisfied with its condition. "

Consider these factors- Type of Pool (fiberglass/concrete, liner pool/spa, etc.)

- Council requirements

- Budget

- Plans after removal


Partial Removal/Decommissioning-only

When allowed by the council, this method is used to remove concrete and liner pools. The process involves filling the pool with sand and draining it.


Advantages

This option is the most affordable. Pool demolition costs in Melbourne range from $3,000 to $6,000. Plus taxes.


Disadvantages

  • The pool area is not buildable. This means there is no need to add or construct dwellings.
  • You should inform your buyers. This can affect the value your home, depending on whether you are planning to subdivide or build a new one.
  • Improper removal can lead to serious injuries.

Important notes

  1. Your council may require that the top rim be removed. It can be as far away as 300m or 600m depending on your council's requirements ). Other fees may apply Cost is usually around $2000 plus GST.
  2. You might consider asking your contractor if the rubble can be used for fill.
  3. Check with your council to confirm that an inspector is needed before the hole can been filled. They may not remove you off their rates list.

Complete Removal

After draining the water, all materials including floors and walls are taken out. Now you can make Fibreglass or Concrete pools.


Advantages

Fiberglass pool removal Melbourne costs $3,000 to $4,000 plus taxes. Fill it again.

Fiberglass pool can be removed quickly and efficiently.

It's important to disclose that your property has an outdoor swimming pool.

Seepage and sinkage can be minimized if possible. After all materials have been removed you will be able obtain a compaction certificate or engineer's certification.

Compaction certificates are required to obtain a building permit for subdivisions, additions, or dwellings.


Disadvantages

  • This option can be more costly than partial removal of concrete, decommissioning liner pools and decommissioning them. Taxes are added to the cost.
  • This could take several days or even weeks.


collect
0
avatar
Demolition Melbourne
guide
Zupyak is the world’s largest content marketing community, with over 400 000 members and 3 million articles. Explore and get your content discovered.
Read more