The installation of steel structure buildings is critical. Therefore, the types, specifications and quality of steel structure materials must meet the planning requirements and related national output levels, and sampling and review before use.

1. The actual length of the installation board is measured. According to the measured length and the length of the board number, the board is cut off when required.

2. The plate of the roof will be placed according to the starting line, so that the width coverage of the board is aligned with the starting line, and the design length of the design is discharged at both ends of the plate length.

3. After fastening the two ends of the fastener, install the second board. Its installation order is left to right or from the left, from top to bottom.

4. Installed at the next line logo to review the deviation of the installation of the board. When the design requirements are met, the board is comprehensive and fastened; when it cannot meet the requirements, adjust it within the next sign section and start the installation at one time.

5. When installing the core board, the gap between the dense board should be squeezed. When the position is accurate, when there is still a gap, the insulation material is filled.

6. When installing the on -site composite plate, the upper and lower layers of steel plates are described by the previous narrative, and the insulation surface should be continuous.

7. After the installation, the wall should be checked in time if there is any omissions and fasteners. For the insulation wall surface, the gap should be filled with the insulation material.

8. Master the degree of fastening when the self -attack screw is imprisoned and not excessive. Excessive will cause the sealing ring to flip, and even press the surface of the plate to accumulate water; if the tightness is not in place, the seal will not be in place and the rain leaks will occur.

9. The vertical overlapping of the board should be paved with a sealing strip and a dense glue according to the design, and the tensile rivet with a self -attack screw or a pad should be connected at the overlap. The fastener should be pulled at the sealing bar.